Our services, in detail

Four services, all tested to BS 7671 and certified.

Program 01 · Five-yearly, by law

EICR and landlord certificates

Since 2020 a private landlord in England must have the installation inspected at least every five years, hold the report and give it to tenants. We code honestly: a C1 or C2 means danger or potential danger and we will not issue a satisfactory report where one applies, however inconvenient that is for a tenancy start date.

  • 2 to 4 hours
  • Landlords and owners
  • Fixed fee
  • Access to every circuit

Start this program

Stage 1 · Access

Every board, circuit and accessory.

Stage 2 · Test

Dead and live tests recorded.

Stage 3 · Code honestly

C1 and C2 mean remedial work.

Stage 4 · Report

Issued with the results, not a summary.

Stage 1 · Inspect first

Earthing, bonding and circuits.

Stage 2 · Quote

Written, with what is included.

Stage 3 · Install

Notified under Part P.

Stage 4 · Certify

EIC issued with test results.

Program 02 · RCD protection

Consumer units and rewires

An old board with no RCD protection is the commonest serious finding in east London housing stock. Replacing it also means checking the earthing and bonding, because a new board on inadequate earthing is a tidy-looking installation that still is not safe.

  • 1 to 5 days
  • Homes and landlords
  • Fixed quote
  • Power off periods

Start this program

Program 03 · Find it, then fix it

Additions and fault finding

A breaker that trips intermittently is a fault to be found, not a breaker to be replaced. We test to locate it rather than guessing at the obvious, which is slower on the day and avoids the second visit that guessing guarantees.

  • Per job
  • Homes and businesses
  • Quoted in writing
  • Access to circuits

Start this program

Stage 1 · Test

To locate, not to guess.

Stage 2 · Explain

What is actually wrong.

Stage 3 · Repair

Quoted before proceeding.

Stage 4 · Certificate

Minor works certificate issued.

Stage 1 · Assess supply

Main fuse, board and earthing.

Stage 2 · Honest answer

Including supply upgrade needed.

Stage 3 · Install

With the protection required.

Stage 4 · Certify

Tested, certified and notified.

Program 04 · The supply decides it

EV charge points

A charge point draws a sustained high load, so the main supply, the earthing arrangement and the existing board all have to be assessed before anything is ordered. We check first and tell you honestly when a supply upgrade is needed rather than fitting something that nuisance-trips.

  • 1 day
  • Homes and businesses
  • Quoted in writing
  • Supply assessment

Start this program

Need an EICR or a board replaced?

A free quote after we have looked, with the certificate included.